Thursday afternoon. You’re building the roster for the week after next. Saturday dinner looks busy, so you put five on the floor instead of four. It’s a reasonable call and it takes about four seconds.

The number that tells you whether that fifth person fitted the revenue doesn’t exist yet. It arrives after the shifts are worked, after the pay run, and — if super, payroll tax and workers’ compensation are counted at all — after someone in accounts has assembled them. By then the cost has been committed, worked and paid.

That’s the Commitment Gap: the distance between committing to a cost and finding out whether the venue could afford it. It’s the reason two operators can run the same business and tell completely different stories about labour.

The 30% That Isn’t 30%

Put two owners in a room and ask their labour cost as a percentage of revenue. Both say 30%. Neither is wrong, and they can still be six percentage points apart on what they’re paying to employ people.

Wages alone — the figure that comes straight off the roster and out of most POS reports — is one number. Wages plus superannuation at 12%, payroll tax and workers’ compensation is a different one. Loaded, it runs roughly 14.5% above the wages-only figure under the payroll tax threshold, and around 20.6% above it once you’re over. Most two-to-fifteen venue groups are over. So the venue sitting comfortably at 30% on the wages-only measure is putting about 36% of revenue into employing people.

Nobody chose the partial number. It’s the one the systems surface first, and it’s genuinely useful for day-to-day rostering. The problem only appears when it’s compared against a benchmark, another venue, or last year — without checking both sides are using the same definition.

The Definition Is the Smaller Problem

Fix the definition and you still have a figure that describes a week you’ve already paid for. Reporting tells you what happened. Forecasting shows you what’s coming.

The number that matters on Thursday is a different one: what this specific roster will cost under the award — penalties, overtime, weekend loadings included — measured against the revenue you’re actually expecting, service period by service period. A Saturday dinner shift at penalty rates costs 50–75% more per labour hour than a weekday lunch. A roster that looks balanced in hours isn’t balanced in dollars, and the hours view is the one most rostering tools give you.

What Changes When the Number Arrives First

Viability’s AI-driven rostering sets an allowed labour figure from a 95%+ accurate revenue forecast, broken into the four service periods that make up the trading day, up to two weeks ahead. Award interpretation sits inside the roster builder, so the allowed labour figure reflects what will actually hit payroll rather than a flat hourly rate. The heat map shows which service periods are over or under-staffed before the roster is published, not after the week has traded.

Dynamic benchmarking then holds that same definition in place afterwards, anchored to live revenue instead of a percentage set once a year. One figure, calculated the same way, in front of the owner, the ops manager and the person building next fortnight’s roster.

One Language Across Two Venues

Frank Cecere took over Cotto in late 2015 with no systematic view of performance and rostering set by intuition. He moved his managers off labour percentage entirely and onto revenue per labour hour. Seventy dollars per hour signalled overstaffing. One hundred and eighty plus meant understaffing and service about to suffer. The healthy band was $100–150, and both venue managers worked to the same one. The group reached break-even ten months from takeover.

That’s what a shared definition buys: two managers discussing the same measure instead of each defending their own version of it.

The comparison cuts the other way too. One multi-venue group put two similar sites side by side on the same numbers and found the underperformer was carrying cost the stronger site wasn’t. It lifted profitability by A$2,000 a week within two weeks. Nothing about that was hidden by carelessness — it was split across two systems that had never been read against each other. Improvement almost always surfaces in rostering and scheduling first, then in parts of ordering.

The Fairness Part

There’s a second thing a pre-publish number does. A roster built to benchmark productivity at the moment it’s published can be ruled fair at the moment it’s published. If revenue then falls short, that’s a revenue shortfall, not a manager’s failure — and everyone can see which one it was.

That ends the Monday conversation where an ops manager and a venue manager argue about a week neither of them can reconstruct. Good managers leave over that conversation more often than they leave over the roster itself.

Before the Next One Goes Out

The next roster you publish is a decision about money. At the moment, you’ll find out whether it was the right one somewhere in the fortnight after the shifts are worked. It can arrive while the draft roster is still open on the screen instead.

See what a roster costs before it’s published — against your forecasted revenue, with the award already in the number. Book a demo at viability.io/book-a-demo.

Viability.io helps Australian multi-venue operators move from average hospitality margins of 3–6% toward the 8–16% their best-run venues are already capable of — through real-time forecasting, labour, and supplier visibility.

Also in this series:

share this article